Date of Initial Handover meeting: 7 August 2025

Date of Final Handover meeting: 12 August 2025

Attendees


Page properties


Handover Status

Status
subtletrue
colourRed
titleINITIAL Handover COMPLETE



Agenda


 

Items to be discussed

Actions

1

Prerelease Content Management Activities:

  1. Inactivate the root concept synonym referencing previous release, and add synonym to reference current release.
  2. Update copyright date on synonym (January releases only)
  3. Generate + Validate SEP Refsets
  4. Generate + Validate Lateralizable Refset
  1. SNOMED Clinical Terms version: SNOMED Clinical Terms version: 20250901 [R] (September 2025 Release)
    5475554010
    https://authoring.ihtsdotools.org/#/tasks/task/DAILYPROMO/DAILYPROMO-9194/edit
  2. Copyright date on synonym - not required for September release.
  3. SEP - https://docs.google.com/spreadsheets/d/1evy3XiZbiw1h7GfpMzaL0KtUwoo1KtTk_uF-XOOuK9in2I1cekpY8DyNNcQNdjokoLlKPYPVHPgiOx4HrWvrxI/edit?usp=sharing
  4. Laterality - https://docs.google.com/spreadsheets/d/1evy3XiZbiw1h7GfpMzaL0KtUwoo1KtTk_uF-XOOuK9in2I1cekpY8DyNNcQNdjokoLlKPYPVHPgiOx4HrWvrxI/edit?usp=sharing
2

Known issues

SP ref set missing members, needs change to rule

Jira
serverIHTSDO JIRA
serverIdb202d822-d767-33be-b234-fec5accd5d8c
keyINFRA-15125
 

3.

New validation/traceability 

Manual changes required for SEP reference set, resolved - https://jira.ihtsdotools.org/browse/INFRA-15656

Traceability warning post MRCM change promotion, checked and validated as expected - https://jira.ihtsdotools.org/browse/INFRA-15377

4.

MRCM changes

New changes for September release

The following entries inactivated in the RF2 refset release file. These changes should not have any impact on existing concepts and modeling. 

Refset_MRCMDomain

29c92b36-6617-4ae6-a1f5-07cd5d256849    20250601    1    900000000000012004    723560006    387713003    << 387713003 |Surgical procedure (procedure)|    71388002 |Procedure (procedure)|    << 71388002 |Procedure (procedure)|    [[1..*]] 260686004 |Method| = [[+id(<< 129284003 |Surgical action (qualifier value)|)]]  ...

Refset_MRCMAttributeDomain

4e6d8a7b-2adf-40ce-811c-f6a194b14b6f    20250601    0    900000000000012004    723561005    424876005    387713003    1    0..*    0..1    723597001    723596005

Jira
serverIHTSDO JIRA
serverIdb202d822-d767-33be-b234-fec5accd5d8c
keyATF-1702

Jira
serverIHTSDO JIRA
serverIdb202d822-d767-33be-b234-fec5accd5d8c
keyINFRA-15377

New and changed MRCM report 

https://docs.google.com/spreadsheets/d/1c3roOJ2xRm3edGJ73zqXl3ZDfGlR6H8vV_nnOQvVJfI/edit?usp=sharing

Requested update to New and Changed MRCM report

Jira
serverIHTSDO JIRA
serverIdb202d822-d767-33be-b234-fec5accd5d8c
keyRP-1035

5.

Content Validation Reports

  1. Instead of usual manual Content validation, we now just need confirmation that all Projects had automated validation run against them, and were clean before promotion.
  2. New Issues identified by the community from the previous Monthly Release.
    1. Decision on whether to fix the issues:
      1. VERY QUICKLY in time for this upcoming release?
      2. In good time for the next monthly release?
6.Mapping schedule

August 2025 Release (figures as of July 10th)

  • ICD-10
    • New concepts – 649
    • Reactivated concepts – 1 (95706000 |Phacoantigenic uveitis (disorder)|)
    • Published concepts QA'd in total – 2,307
  • ICD-O
    • new activity in the ICD-O map this month – 3 new concepts (all 'No target') & 1 concept QA'd (no change to map)
    • so zero actual changes to the map


September 2025 Release (figures as of 7 August)

  • ICD-10
    • New concepts – – 816 + some from Friday 8th
    • Reactivated concepts –  64347002  Vertebral artery compression syndrome (disorder) inactive since 2004
    • Published concepts QA'd in total – – 2500 ish
  • ICD-O
    • new activity in the ICD-O map this month – 0
    • actual changes to the map - 0
7.Brief run through of the known issues already identified by the content team during the QA batch process, to ensure that technical team are aware of them, and can either resolve them in time for the release, or confirm as known issues.

Deleted from main
1373124006 |Educated about risk of exposure to sun (situation)|
1373123000 | Education about risk of exposure to sun (procedure)

Inactivated and then reactivated in same release cycle from main
183079004 |Patient advised about exposure to the sun (situation)|

September 2025 inactivation of 715515008 |LOINC - SNOMED CT Cooperation Project module (core metadata concept)|

Jira
serverIHTSDO JIRA
serverIdb202d822-d767-33be-b234-fec5accd5d8c
keyLE-42

Just FYI that the map figures might be 1 or 2 out this cycle...

8.DevOps resource confirmed

Joe

9.Versioning and Change Freeze
10.Stats Report

Summary Component Stats Report

11.Risks

Atlassian tasks will change due to removal of workflow:

  • Devops to review the process with Maria to confirm what the new process should be, in order to prevent delays
  • Also need to confirm which stakeholder should be responsible for each task
  • UAT required for critical tasks such as locking the branches, etc

Time taken for overnight mapping server jobs:

  • September 2025 - Small increase in time taken on 8th August, but ony6 by 15mins so we'll just keep an eye on it to see if keeps going up or levels off....
  • August 2025 - small improvements from last time, so will keep an eye on this run and see if we need to make any more refinements
  • July 2025 - RICK STILL HAVING TO MANUALLY BOUNCE MYSQL DUE TO THE SWAP SPACE STILL FILLING UP DURING THE OVERNIGHT JOBS...
  • Chris is going to increase the SWAP space in the meantime, and open a ticket to investigate root cause in the long term...  Some changes made in May 2025...
  • 5th June 2025 - SWAP size still creeping up, so we'll check it again this cycle and see if any other action required...
  • 6th June 2025 - System came back online around 8:30am, so job seems to be back to running at roughly the normal time, so we will just continue to keep an eye on it for now...

Possible changes to dates required for October 2025 release schedule due to Jira/Confluence update

October 2025 International Edition Release Schedule - Production Monthly Release - INTERNAL

12.AOB