How to promote a complex task (one with SAC/AAG gateway controls) to include its changes in the parent project. This is an extension of the simpler promotion process for non-complex tasks.



Advanced Tables - Table Plus
classuser-guide-steps-references


StepsReferences

The Complex  slider control in the upper-right of the Task View - Task Details panel defines whether or not a task is Complex.

Image Added 

Move the Complex  slider to the right to set the Setting a task as Complex.

This activates any task-level Service Acceptance Criteria (SAC) which are defined within the parent project SAC configuration.

Task-level SAC are presented in two lists, between the Task Details section and the Edit Task Details  button in the Task View - Task Details panel, and are common to all Complex tasks within the parent project.

Automatic SAC are listed to the left, with Manual SAC to the right. Automatic SAC present as a warning symbol if not yet met, and a green-ticked box if their automated system checks confirm they are satisfied. Manual SAC are presented initially as open checkboxes, each of which can be interactively checked (green-ticked) when the user's role-based access permissions match those configured for that SAC control.

Until all mandatory task-level SAC Until these are met, task promotion will be blocked and Promote This Task to the Project  in the Task View - Task Details panel actions button list will not be enabled.

Info
titleInternational Authoring - Task SAC - Examples

Excerpt Include
Service Acceptance Criteria (SAC) and Authoring Acceptance Gateway (AAG) controls
Service Acceptance Criteria (SAC) and Authoring Acceptance Gateway (AAG) controls
nopaneltrue


Image Added

When all mandatory task-level SAC conditions are met for a Complex task then promotion is enabled and Promote This Task to the Project  in the Task View - Task Details will become active. Once promotion is enabled, follow the non-complex task promotion steps (included below).


Excerpt Include
Promote my (non-complex) task changes to their parent project (share with other authors)
Promote my (non-complex) task changes to their parent project (share with other authors)
nopaneltrue